Chelsea Court


Equans has successfully been appointed as main contractor to undertake major regeneration works at Chelsea Court.

As per Peabody's requirements, Equans is undertaking internal remodelling of the block and complete refurbishment of the 71 self-contained flats with new communal facilities, main entrance, fire escape link bridge, vehicle and pedestrian entrance, terrace, landscaping and new roof.

We are also renewing internal elements including doors, kitchens, bathrooms, ceilings, flooring, mechanical, heating, water supply, electrical, lifts, fire alarms, emergency lighting, fire compartmentation, care alarm and door entry IRS/4G system as well as a new Mechanical Ventilation Heat Recovery (MVHR) system.

The scheme is split into three phases; Phase 1 includes works to the West Wing, Phase 2 to the East Wing and finally Phase 3 to the North Wing.

The scheme is expected to be completed by Summer 2024.



Equans has successfully been appointed as main contractor to undertake major regeneration works at Chelsea Court.

As per Peabody's requirements, Equans is undertaking internal remodelling of the block and complete refurbishment of the 71 self-contained flats with new communal facilities, main entrance, fire escape link bridge, vehicle and pedestrian entrance, terrace, landscaping and new roof.

We are also renewing internal elements including doors, kitchens, bathrooms, ceilings, flooring, mechanical, heating, water supply, electrical, lifts, fire alarms, emergency lighting, fire compartmentation, care alarm and door entry IRS/4G system as well as a new Mechanical Ventilation Heat Recovery (MVHR) system.

The scheme is split into three phases; Phase 1 includes works to the West Wing, Phase 2 to the East Wing and finally Phase 3 to the North Wing.

The scheme is expected to be completed by Summer 2024.


  • Works update - November 2022

    Welcome to our site works update for November

    Site update

    Access to the east wing is now restricted to the residents.

    Current works

    The east wing is currently being surveyed. Isolation of the services i.e. water, heating, and electricity have now been shut off - as a result of these works the heating system had some minor issues but we are working hard to resolve this as soon as possible, we apologise for any inconvenience caused. Hard and soft strip have started and are due to be complete before Christmas.

    Remedial work

    As a reminder for those living in the west wing, please note any works you would like the handyman to carry out in your apartment. The handyman will perform tasks such as mounting shelves, blinds, TVs, coat hooks, picture frames, and assembling flat-pack furniture etc. Please then pass your list to Peabody's Scheme Manager, Alex to be communicated to the site team.

    Further update

    Scaffolding has been erected around the west wing due to a leak. Alex will be in contact with the residents affected.

    If you have any queries about the works being carried out please speak to Site Manager, Sergiu on 07977 165 330.

  • Site team achieve top marks from Considerate Constructors Scheme!

    The Equans site team at Chelsea Court received an amazing score of 45/45 from their recent audit visit by the Considerate Constructors Scheme (CCS) after scoring top marks in each of the three categories.

    On 17th October, a CCS monitor visited the scheme and carried out their audit of the site, commenting things like "This is an excellent project which is demonstrating robust commitment to the CCS Code of Considerate Practice. The site was seen to be very clean, tidy and well organised. The provision of a site specific microsite is commendable. Emphasis is placed on consideration for the elderly residents and the site team strive to ensure that there is minimal disruption whilst the works are in progress."

    The CCS is an independent organisation founded to raise standards in the construction industry to ensure all construction sites present an image of competent management, efficiency, awareness of environmental issues and above all neighbourliness. Monitors from the scheme regularly audit our sites to ensure we are adhering to the scheme’s Code of Considerate Practice which is designed to encourage best practice beyond statutory requirement.

    Each audit is split into three categories; respect for the community, protecting the environment and valuing the workforce each with a potential score out of 15 with a total combined max score of 45 available. To score above 13 in any category warrants an excellent level of achievement for that category.

    Congratulations to Site Manager, Sergiu and the rest of the site team, who work so hard every day to maintain such high standards

    Click here for a short video to celebrate our score.

  • Works update - October 2022

    Welcome to our site works update for October

    Site update

    Relocation of residents from both the north and east wings has been completed. Those that remained in the east wing have been relocated to the north wing in preparation for phase 2 of the works.

    Access to the east wing will now be restricted to the residents.

    Current works

    The east wing is currently being surveyed. Services are being isolated i.e. water, heating, and electricity are being shut off.

    Remedial work

    As a reminder for those living in the west wing, please note any works you would like the handyman to carry out in your apartment. The handyman will perform tasks such as mounting shelves, blinds, TVs, coat hooks, picture frames, and assembling flat-pack furniture etc. Please then pass your list to Peabody's Scheme Manager, Alex to be communicated to the site team.

    Further update

    Scaffolding has been erected around the west wing due to a leak. Alex will be in contact with the residents affected.

    If you have any queries about the works being carried out please speak to Site Manager, Sergiu on 07977 165 330.


    Click here to read the full newsletter

  • Happy Halloween from Equans

    From all of us at Equans, we wish you a happy Halloween.


    A children's activity pack can be collected from your Resident Liaison Officer. Alternatively this can be viewed and downloaded from our 'Documents Library'.

    Please be careful if carving pumpkins and stay safe whilst trick or treating.

  • FREE induction pots and pans for West Wing residents

    supporting image

    West wing residents can now claim free brand new pots and pans for their new induction cooker hobs from Peabody Scheme Manager, Alex Dacosta.

  • Home User Guide now available

    For all residents that have recently moved into a new property, there is now a Home User Guide from Peabody available.

    The guide, which can be viewed from the 'Document Library' or by clicking here, includes helpful information about your new property including useful contacts, safety information, appliance instructions, tips on cutting costs and much more.

  • Works update - September 2022

    Welcome to our site works update for September

    Garden passes

    A letter has been sent regarding the garden passes that should expire at the end of September. This letter is for those that need to renew their pass as well as for those that didn't request a pass last year but would like to receive one this year.

    It is important that you fill in your details at the bottom of the letter that has been provided or provide your name and flat number on a piece of paper to Peabody. We will collect these slips later to order the passes.

    When providing your information, please ensure that the writing is clear and the information being provided is only your full name and flat number.

    We aim to collect all slips four weeks from the date that is shown at the top of the letter sent, so please ensure you provide your information within the given timeframe.

    Works to be expected

    Asbestos surveying is now complete and works are expected to begin in October.

    External works

    The external works that will be carried out on site is the continued work to the bell tower on the east wing roof.

    Internal works

    As you are all aware, Peabody and EQUANS have begun the move for those living in the north wing to the west wing. Remedial checks have been completed in some of the north wing apartments in preparation for those currently living in the east wing to move into, while phase 2 is being carried out in the east wing.

    If you have any queries about the works being carried out please speak to Site Manager, Sergiu on 07977 165 330.


    Click here to read the full newsletter

  • Scaffold Safety

    supporting image

    According to the HSE, accidents on scaffolding involving members of the public due to unauthorised trespassing is on the rise due to the current trends:

    • Climbing for fun
    • Free running
    • Live PokemonGo Running

    The primary driver for Peabody and EQUANS, is your safety and that of other visitors and our workers. With this in mind, we would like to remind everyone that the following should apply:

    • If you see anyone on the scaffolding outside of our working hours of Monday-Friday or at the weekend, please contact the Police immediately on 101
    • Only employees of EQUANS and authorised client representatives are allowed on the scaffolding
    • For safety reasons, any other persons on the scaffold will be deemed to be trespassing, which will mean that the Police will be contacted

    If any trespassing issues are reported we will take punitive precautionary measures, which may include installing fencing to prevent access. This is something we don't really want to do but safety has to be a key factor.

    If you have an emergency outside of our normal working hours (Mon-Fri, 8am-5pm), please call Peabody's Out of Hours Number: 0300 123 3456.

  • Works Update - August 2022

    Welcome to our site works update for August

    While Peabody is preparing for the residents to move back into the West Wing (Floors 1-5). The EQUANS site team have been and are currently scheduled to carry out asbestos surveys in the North and East Wings.

    As it has been previously mentioned, access was needed to some properties, but those who's apartments that have to be accessed will be notified ahead of time.

    Remedial Appointments

    As some of you are preparing the move back into the finished wing, remedial appointments have been scheduled. A member of the EQUANS site team will come to inspect the apartment and note any issues, please use this opportunity to update the site team of any issues in your apartment(s).

    Garden Pass Update

    The current passes will be expiring at the end of September 2022.

    For those that want to renew or receive a card this year, a letter will be sent out for you to complete. The information that will need to be provided will include your name and flat number. This information will then be collected by Peabody's office at a later date.

    A reminder will be sent out at the final week of collection in case some of you forget.


    Click here to read the full newsletter

  • Works Update - July 2022

    Welcome to our site works update for July

    The Chelsea Court site team is proud to announce that they have achieved handover for the first phase. This means that residents will soon be able to move into their refurbished homes.

    The site team recently had labourers on site installing curtains in the apartments in preparation for when residents move in.

    Second Phase

    As the first phase (West Wing) has now been achieved, the site team is now beginning the second phase (East Wing). Those of you that live in the East Wing would have received a letter regarding asbestos surveying.

    Monday the 1st of August, we may require access to the homes to carry out the surveys. The access request has been mentioned in the letter as allowing us access to all homes is not compulsory as only some would be required. Surveys will be carried out from 8am-5pm.

    A reminder that the surveys being completed is safe and residents do not have to worry about health and safety.

    Moving Schedule

    As residents will soon be able to move back into the West Wing, a moving schedule has been created to ensure that the transition from the currently occupied wings to the newly refurbished wing is carried out smoothly. The move will occur in groups of 2 - 4 at a time.

    Garden Pass

    A reminder that we'll soon need to renew the current garden passes. As not all residents requested a pass last year, but would like to this year, please ensure that you send a request for a pass on the renewal date.


    Click here to read the full newsletter