    Photos

    Precision measures for datum lines ( in outs)_Nov23
    previous next
    General Progress_Sep24
    General Progress (2)_Sep24
    General Progress (3)_Sep24
    General Progress (4)_Sep24
    General Progress (5)_Sep24
    General Progress_Aug24
    General Progress (2)_Aug24
    General Progress (3)_Aug24
    Level 21 Winter Gardens and Top Coat_Jun24
    Level 21 Winter Gardens and Top Coat (2)_Jun24
    Level 21 Winter Gardens and Top Coat (3)_Jun24
    Level 21 Winter Gardens and Top Coat (4)_Jun24
    Level 21 Winter Gardens and Top Coat (5)_Jun24
    Level 21 Winter Gardens and Top Coat (6)_Jun24
    Level 21 Winter Gardens and Top Coat (7)_Jun24
    Level 21 Winter Gardens and Top Coat (8)_Jun24
    Level 21 Winter Gardens and Top Coat (9)_Jun24
    Completed Winter Gardens_Mar24
    Completed Winter Gardens (2)_Mar24
    Level 21 Winter Gardens and Top Coat (10)_Jun24
    Completed Winter Gardens (3)_Mar24
    Completed Winter Gardens (4)_Mar24
    Completed Winter Gardens (5)_Mar24
    Completed Winter Gardens (6)_Mar24
    Completed Winter Gardens (7)_Mar24
    Completed Winter Gardens (8)_Mar24
    Completed Winter Gardens (9)_Mar24
    Completed Winter Gardens (10)_Mar24
    Completed Winter Gardens (11)_Mar24
    Completed Winter Gardens (12)_Mar24
    16th floor install_Nov23
    17th floor install_Nov23
    21st floor final trims following new roof_Nov23
    21st floor winter garden new roof_Nov23
    Bracket installs once leveled_Nov23
    Curtain wall completion awaiting render coats_Nov23
    Installation of pressure plates_Nov23
    Internal progress to lower floors to SE corner_Nov23
    New roof covering_Nov23
    New roof covering (2)_Nov23
    New roof covering (3)_Nov23
    New roof covering and detail_Nov23
    Precision measures for datum lines ( in outs)_Nov23
    Transom installs to 17th floor_Nov23
    Vertical measures for datum lines_Nov23
    Winter garden completion_Nov23
    Winter garden completion (2)_Nov23
    Winter garden completion (3)_Nov23
    Winter garden roof and replacement preparation_Nov23
    1st coat render to front elevation_Sep23
    Balcony works in progress level 4_Sep23
    Completed balcony to level 8_Sep23
    EWI installation and new condenser pipes_Sep23
    Fire rated red fin works_Sep23
    Fire rated red fin works (2)_Sep23
    Fire rated steel ready for EPDM works_Sep23
    Insulation to ceilings and external walls_Sep23
    Level 5 1st coat render system_Sep23
    New windows, fire panels and extended condenser pipes_Sep23
    Newly installed balcony level 18_Sep23
    Specially engineered brick ties to concrete slab_Sep23
    Window protection awaiting 1st coat render system_Sep23
    Four layer application to fin_Jul23
    Access to roof level for new roof_Jul23
    Fin decoration 2nd side roof level_Jul23
    Fire rating protection to winter garden_Jul23
    Hoist adaption to roof level new roof_Jul23
    New capping detail to fin on roof_Jul23
    Red fin fire proof and decoration_Jul23
    Roofing material delivery_Jul23
    Sealer coat application to new EWI_Jul23
    Tank room housing redecoration_Jul23
    Winter garden window installation_18th floor_Jul23
    Two layer external insulation_Jun23
    Completed Winter Garden_Jun23
    EPDM waterproof barrier_Jun23
    First coat render system and fire fixings_Jun23
    External corner insulated detail_Jun23
    External insulation detail to windows_Jun23
    Fully removed balcony_Jun23
    Newly installed lightening protection_Jun23
    Newly installed windows_Jun23
    Newly positioned boiler flu to fire panel_Jun23
    Render coat to fire fixings_Jun23
    Steel prep for 2hr fire paint protection_Jun23
    Render system and fire fixings_Jun23
    Window protection to new windows_Jun23
    Works in progress on removal of balcony_Jun23
    Fire proof batt with 10% compression_Apr23
    Scaffold Erection_Apr23
    Scaffold Erection (2)_Apr23
    Scaffold Erection (3)_Apr23
    Timber removal and SF panel replacement_Apr23
    Winter garden window installation with EPDM detail_Apr23
    Winter Garden window replacement in progress_Apr23
    Hoist Installation_Aug21
    Scaffold Erection_Jun21
    Before Works_Oct20