Skip To

  • Skip to content
  • Jump to navigation
  • Search

Page Outlines

Loading...

    Globe

    IE10 and below are not supported.

    Google Chrome Mozilla Firefox

    Contact us for any help on browser support

    You are here:

    • Home
    • Griffin House

    Image Library

    Balcony post being installed.jpg
    previous next
    Hardie plank fitted to top level.jpg
    Finished Hardie plank fitted to top level.jpg
    Balcony post being installed.jpg
    Bricks removed to install Fire Cavity Bar.jpg
    Fire barrier installed to balcony_Jul24
    Fire barriers, C-channel and T-profile fitted to membrane_Jul24
    C-channel and T-profile fitted to membrane_Jun24
    Installed breather membrane_Jun24
    East entrance of the building_Apr24
    Fire stopping process_Apr24
    Fire stopping process (2)_Apr24
    Fire stopping process (3)_Apr24
    Fire stopping process (4)_Apr24
    Fire stopping process (5)_Apr24
    Fire Stopping Process (6)_Apr24
    Fire stopping process (7)_Apr24
    Walkaround the scaffolding_Apr24
    Firerated mastic and tape_Jan24
    Insulation_Jan24
    OSB board_Jan24
    Stripping_Jan24
    Scaffold erection_Front elevation_Oct23
    Scaffold erection_Rear elevation_Oct23
    Resident respite set up_Sep23
    Resident respite set up from outside_Sep23
    Scaffold erection completed_Front elevation_Aug23
    Scaffold erection in progress_Front elevation_Aug23
    Scaffold erection completed_Rear elevation_Aug23
    Hoist being installed_Jul23
    Block before works_May23
    Installation of resident respite facilities_Jul23
    Resident respite set up_Internal_Jul23
    Scaffold erection in progress_Rear elevation_Jun23